Our priority is to carry out actions aimed at recovering the area impacted by the collapse of Dam B1, in Brumadinho.

It is our duty and our priority to carry out actions aimed at the environmental recovery of the entire area affected by the collapse of Dam B1, in Brumadinho. 

It is Vale's duty and priority to carry out actions aimed at the environmental recovery of the entire area impacted by the collapse of Dam B1 in Brumadinho. 

On this page you can find all of the environmental remediation initiatives carried out by Vale. 

Environmental recovery is divided into five fronts:

button-next button-next
Preservation of local flora and fauna; 
Removal of tailings on land and in the river, allocating them to safe and controlled areas; 
Containment of tailings, preventing them from reaching the river during rainy periods; 
Monitoring and restoration of water and soil quality; 
Human and ecological health risk assessment studies.
seta-direita scroll-to-see-more

Water quality monitoring 

 

Since January 2019, Vale has been carrying out water quality monitoring work in the Paraopeba River basin, its tributaries, as well as stretches of the São Francisco River, although the latter were not affected by the B1 Dam failure. 

In addition to the monthly monitoring carried out by the Minas Gerais Water Management Institute (Igam), the quality of the waters of the Paraopeba River and its tributaries is monitored by Vale, respecting the commitment assumed with the responsible public bodies. All this work is accompanied  by an independent technical and environmental audit, appointed by the Public Ministry of Minas Gerais (MPMG). 

The data obtained by the monitoring works are  eriodically delivered to Organs inspection bodies and to the Public Ministry of Minas Gerais. 

In order for you to better understand all the information on this page, we have produced a glossary. Click here

Want summary information to access and share? Click here to download the booklet 

Discover all the monitoring points that exist today 

Mouse over the map to see more details

How is monitoring done? 

Mouse over the map to see more details
Ícone representando duas gotas de água um tubo de ensaio Ícone representando três tubos de ensaio Ícone representando um recipiente com água e uma régua medindo a profundidade Ícone representando uma lupa e algumas moléculas ao fundo

What results have been obtained so far?

  • The tailings have been retained in the reservoir behind the Retiro Baixo Hydroelectric Dam in Pompéu, Minas Gerais, and have not reached the São Francisco River;
  • The water in the reservoir behind the Três Marias Hydroelectric Dam is not contaminated, as demonstrated by the environmental agencies’ studies;
  • The heavy metal levels are progressively declining during the dry season;
  • Statistical tests indicate a significant trend of improving water quality during the dry season.
Photographer: Vale’s Archive 
Onda
A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.
A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.
A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.
A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.

Metal concentration

Since January 2019, a complete list of metals has been analyzed in water and sediment samples from the Paraopeba River, main tributaries and also in points in the reservoirs of the Retiro Baixo and Três Marias Hydroelectric Power Plants.

The presence of metals in water can also be associated with the dissolution of compost from the soil, and the contents of these metals are directly related to the geological composition of the places where water bodies are inserted or discharge of industrial effluents and other human activities.

How to interpret maps

To verify the quality condition of the Paraopeba river stretches, a comparison is made of the monthly maximum result of each parameter with the maximum of the seasonal periods obtained before the disruption by Igam monitoring.

The result of this comparison with the pre-disruption period (called baseline) is graphically represented by colors, ranging from the best result (blue) to the worst (red), as follows:

pre-breakup condition
worst condition
A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.
A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.
A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.

Dissolved iron

Total manganese

The Paraopeba river basin crosses the region known as the Iron Quadrangle of Minas Gerais, and records of naturally high concentrations of iron and manganese in the waters are common, even above the quality standards, even in the historical series of data from Igam before the break.

In the monitoring carried out by Vale,   significant results of these metals were identified in stretches more impacted by the input of tailings, with attenuation as we move away from the region where the Ferro-Carvão stream meets the Paraopeba river. The contents of manganese and iron, in total form, show an increase in the rainy season and a reduction in the dry season, and the current condition indicates that the water quality is in a transition phase, with a progressive reduction in concentrations.
A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.

Dissolved aluminum


The analysis of aluminum metal has shown significant concentration levels, which may be associated with the tailings. However, specifically in the stretch of the Paraopeba River after the municipality of Maravilhas, it is observed that natural geological factors influence the increase in the concentration of this element.
A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.
A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.
A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.

Trace metals

Other metals can also be found in water in much smaller amounts and sporadically, they are called "trace metals". Some analytical results pointed to isolated occurrences of pronounced concentrations for trace metals.

However, for these elements, which are also present in the tailings, the data analyzed currently show that the levels in the Paraopeba River are similar or even lower than those recorded in public databases for the pre-rupture period.

A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.

HTML Example

A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.

Turbidity

Turbidity is a basic parameter for assessing water quality, easily influenced by rainfall and related to the transparency and quantity of suspended particles

The presence of suspended solid materials such as clay, organic and inorganic matter, microscopic organisms and algae cause water turbidity.

The origins of these materials can be diverse:

  • River bottom sediments;
  • Soils on the banks and in areas with suppression of vegetation;
  • Mining;
  • Sand removal or clay exploration;
  • Industrial waste;
  • Domestic sewage.

HTML Example

A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.

A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.
A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.
A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.

Understand the difference in water behaviour in the rainy x dry season

Climatic aspects have a relevant influence on water quality. During rainy periods, the water tends to become more turbid, mainly due to the carrying of materials from the banks and the resuspension of sediments from the bottom of the river. On the other hand, in periods of drought (drought), the rivers present reduced flow, low flow velocity and less resuspension of sediments, resulting in better measurements of some parameters.

Regarding the Paraopeba River, we can say that, in periods of drought, the water quality approaches the conditions prior to the break.

The joint analysis of the dissolved aluminum, dissolved iron and total manganese parameters shows that there is a progressive reduction in the concentration of these parameters, indicating recovery close to the conditions of a class 2 river in periods of drought.

During the rainy season, the water quality worsens, as has happened in the past. The increase in the concentration of some of these parameters such as aluminum, iron, manganese and turbidity may be related to the suspension of the material deposited on the riverbed and the new contributions caused by natural soil materials in the region, or due to other activities historically carried out in the region.

The evaluation of the water quality of the Paraopeba River and its tributaries continues to show results that indicate the  reduction of several physicochemical parameters, regardless of the influence of climatic factors.

Monitoring in numbers

Mouse over icons to see more details 

About 90 monitoring points.

14 telemetric stations installed for continuous monitoring.

6.5 million results from water, soil and sediment.

More than 53,000 samples collected.

About 250 professionals involved in this process.

Fotógrafo: Ricardo Teles

Monitoring of the Paraopeba River by IGAM 

Vale signed the Term of Commitment (TC) with the Public Ministry of the State of Minas Gerais (MPMG), which establishes the  transfer of all monitoring actions of water resources and sediments along the Paraopeba River Basin and in the São Francisco River for the Minas Gerais Water Management Institute (IGAM). To absorb the monitoring data after the breakup, Vale is developing, together with IGAM, a water monitoring software for the entire State of Minas Gerais. Vale  hires a technical and independent auditor, who is responsible for overseeing the entire transfer process, which is expected to take 33 months after the signing of the Global Agreement.

Igam has a fundamental role as a supervisory body, in the scope of evaluating the results and studies related to the sampling carried out by Vale, as well as in requesting responses and proposing changes in the way the work is being carried out. 

Igam reinforces that the recommendation of not using raw water from the Paraopeba River for any purpose is still maintained, as a preventive measure, in the stretch that covers the municipalities of Brumadinho up to the limit of the Retiro Baixo HPP, in Pompéu (approximately 250 km from distance from the break). The use of water in the stretches before the municipality of Brumadinho (before the stretch affected by the rupture) and after the Retiro Baixo HPP are authorized for a wide range of purposes and there is no restriction by public bodies. 

Monitoring the quality of the water is essential to subsidize the agency and, in the future, allow the resumption of use. This is a decision that does not depend on Vale, and to support the assessment of the water quality condition, the monitoring results are periodically sent to the State's supervisory bodies. 

Cycle Closing Report: understand what it is for and what is done with it 

The Cycle Closing Report contemplates the evaluation of monitoring data within the scope of the Monitoring Plans. 

It presents the behaviour of the results of monitoring of surface waters and sediments in the Paraopeba river basin up to the Três Marias reservoir, in different seasonal periods. 

The document aims to present an assessment of the quality of water and sediment, bringing into consideration the variations that occur during the rainy and dry periods of the hydrological cycles, over the years of monitoring.

Photographer: Vale’s Archive 

Water Supply 

After the B1 Dam Breach in Brumadinho, the use of water from the Paraopeba river was interrupted and Vale assumed a commitment, with the competent public authorities to guarantee the water supply of all municipalities impacted by this measure. 

Our initiatives are divided into two fronts, which serve the public supply and the riverside population: 

Emergency corrective actions
These are actions aimed at animal consumption, agricultural irrigation and human consumption. 
 Structuring preventive actions
Those actions carried out to ensure water security and that usually involve works, in order to promote improvement and adjustments in the public supply. They consist of the drilling and reactivation of deep tubular wells, abstractions in surface water sources and in the installation of water treatment systems. 
 

Public supply 

Access to water in sufficient quantity and quality is a human right. Therefore, we are working with the implementation of several solutions for the supply of drinking water in the municipalities that had withdrawal from the Paraopeba river. 

Know the actions

Pipeline system measuring around 12 km deployed in the Paraopeba river in a region not affected by the rupture with the capacity to operate with the same flow as the previous withdrawal of 5,000 L/s. The purpose of this work is to guarantee the water supply of the Metropolitan Area of Belo Horizonte. 

A pipeline system measuring around 50 km long with withdrawal from the Pará river, which was not affected by the sediments of the B1 dam, for direct service to the municipality of Pará de Minas. The structure's flow rate is 284 l/s, the same volume that the municipality used to capture from the Paraopeba River before the dam breach. 

Watch the video to learn more: 

The water supply to the municipalities of Paraopeba and Caetanópolis is being served through wells drilled and reactivated by Vale and complemented by the surface withdrawal of the Cedro stream. 
Currently, Vale supplies the communities of Parque da Cachoeira, Tejuco, Pontinha, Ponte das Almorreimas, Imperial and Boa Vista. The supply is carried out by tubular wells or water trucks. 
Implementation of a water reservoir with a capacity of 700 thousand m³ as a definitive alternative to the drilled wells and the surface withdrawal from the Cedro stream to supply the municipalities of Paraopeba and Caetanópolis. 
To learn more about the request for drinking water supply via water tankers, call the Call Center: 0800 031 0831. 

Photographer: Vale’s Archive 

So far, Vale has released a flow of: 

204.060.040 liters/day for public supply 

This equates to a city of 1,3 milion Inhabitants 

*Data on October 18, 2022, according flows granted

Supply for the riverside population 

Distribution of drinking water to those who live on the banks of the Paraopeba River. This water can be supplied by wells drilled or reactivated by Vale (structuring preventive actions) or by means of a water truck or mineral water distribution (emergency corrective actions).

Irrigation 

641.246.217 liters 

Animal consumption 

786.078.750 liters

Domestic use 

657.667.483 liters 

21.954.360 liters 

*Data on December 2022 

Agricultural use  

2.797.384.800 liters 

*Data on December 2022, according flows granted​ 

Photographer: Vale’s Archive 

  • Brumadinho 
  • São Joaquim de Bicas 
  • Mário Campos 
  • Betim 
  • Esmeraldas 
  • Juatuba 
  • Florestal 
  • Pará de Minas 
  • São José da Varginha 
  • Pequi 
  • Fortuna de Minas 
  • Maravilhas 
  • Papagaios 
  • Paraopeba 
  • Curvelo 
  • Pompéu 

Learn more

Foto de placeholder Photographer: Vale’s Archive 

Treatment systems  

Vale continues to work to improve the water quality of the Paraopeba river basin. 

One of its actions is the installation of treatment systems to ensure quality water for the population living in the locations between Brumadinho and the Três Marias reservoir. The installation of the new treatment systems was based on an agreement made with the State Health Department of Minas Gerais (SES/MG).

Structuring preventive actions in the Rio das Velhas Basin

button-next button-next

Although it has not been impacted by the B1 rupture, the Rio das Velhas is receiving a preventive investment. Get to know some actions:

Photographer: Vale’s Archive 

Manifolds - Copasa water truck supply  

Improvement works to guarantee the water supply, by means of water trucks, to essential users whose daily consumption is less than 80 m³ of water, to subnormal agglomerations, to vulnerable areas and to regions without technical supply conditions of the Metropolitan Area of Belo Horizonte (RMBH) in case of hypothetical compromise in the water withdrawal of ETA Bela Fama. 

Photographer: Vale’s Archive 

RMBH supply contingency plan  

The plan includes actions that should be implemented, if there is the impossibility of raw water withdrawal in the Rio das Velhas due to any event that compromises the supply in the Metropolitan Area of Belo Horizonte (RMBH).

Photographer: Vale’s Archive 

Cambimbe Pipeline System  

The installation of the pipeline system is a preventive action that guarantees an alternative water collection for Nova Lima and Raposos in case of water withdrawal in Rio das Velhas being compromised. The pipeline, which will have about 4 km, will take the water from this point to the Bela Fama Treatment Plant (ETA). 

Photographer: Vale’s Archive 

Carlos Prates Pipeline System  

Implementation of a 2 km long pipeline system in the Novo Glória neighborhood in Belo Horizonte, which connects the water supply systems of the Paraopeba River Basin to the Rio das Velhas Basin. The structure will contribute to ensure an improvement in the current Copasa distribution system and is designed to meet a flow rate of 320 l/s. 

Photographer: Vale’s Archive 

North Vector  

Drilling and reactivation of wells belonging to Copasa in the municipalities of Lagoa Santa, São José da Lapa and Vespasiano including the adjustments in the distribution network to serve 81,000 inhabitants.
Photographer: Vale’s Archive 

Sabará Wells  

Drilling of tubular wells in Sabará for the public water supply serving about 50,900 inhabitants. 

Photographer: Vale’s Archive 

Essential customers  

Essential customers are those who carry out essential activities, as stipulated in ARSAE-MG Resolution No. 68/2015. In this context, for essential users who have water consumption above 80 m³ / day, an alternative action will be implemented to guarantee supply, such as drilling wells, supplementary reserve and redundancy works. The other essential users, with consumption below 80 m³ / day, will be served by water truck.

seta-direita scroll-to-see-more

Water Security  

In addition to the projects executed by Vale, the company is developing 5 (five) basic projects of water safety works, which will be delivered to the water supply concessionaire for subsequent bidding and contracting and aim to guarantee a demand corresponding to 15,000 l/s to supply the Metropolitan Region of Belo Horizonte. 

  • Expansion of the Manso River supply system 

We are developing studies and projects to ensure compliance with the current water demand of RMBH corresponding to 15,000 l/s. One of the structuring interventions is the expansion of the Manso River water supply system. The projects include the expansion of capacity by approximately 55% of the Water Treatment Plant - ETA Manso, and also the expansion of 4 elevators and water pipeline systems.

  • Interconnection pipeline system of reservoirs R10-R13 

The Conduct Agreement (TC) also includes Water Security the preparation of a treated water pipeline project with approximately 30 km in length that will interconnect two reservoirs, called R10 and R13 and increase the possibility of transfer between the water systems of Paraopeba and the Rio das Velhas, which will provide an increase in resilience for public supply of RMBH. 

  • Dam project in the Macaúbas stream 

Projects are being prepared for the implementation water withdrawal works in the Macaúbas stream through the implementation of a dam, shrinkage and water supply until the new withdrawal from the Paraopeba river. These interventions will bring greater security for water reservation and continuity of public supply especially in critical periods (drought). 

  • Withdrawal from Ponte de Arame 

Part of the scope of the Water Security TC consists of studies and projects for the implementation of new water withdrawal in the Rio das Velhas, in the region known as "Ponte de Arame". This new system will have the implementation of 1 run-of-the-river water withdrawal system in its first stage and later with the implementation of a Dam. These projects will supply the Water Treatment Plant - ETA Bela Fama through a pipeline system approximately 25 km in length. As the 1st Dam in the basin of the Velhas river for public supply, this project will provide greater security for supplying the RMBH. 

  • Withdrawal from the Ribeirão do Prata 

In addition, the Water Security scope includes the withdrawal of water in the Ribeirão do Prata, which includes the collection by water and a pipeline extending approximately 9 km to the Bela Fama WTP. 

seta-direita scroll-to-see-more

Biodiversity in the Paraopeba River Basin 

The recovery of the Paraopeba river and its biodiversity is one of Vale's commitments in the reparation work. Therefore, since the rupture of the B1 dam in Brumadinho, short, medium and long-term measures have been carried out. 

Monitoring 

Biodiversity monitoring is carried out on a permanent basis by companies specialized in the area of the environment, biologists, field assistants and veterinarians, with the coordination of university professors. In all, 35 points are studied for aquatic biodiversity and 20 areas for terrestrial biodiversity, which cover regions not affected, areas affected in lesser intensity and areas severely affected by tailings. 

The fauna and flora in some marginal lakes and in the main tributaries of the Paraopeba river are also analysed. 

By expanding monitoring to unaffected locations, it is possible to assess the environmental conditions and the real impact of the disruption on biodiversity. 

It is based on these constant analyses that we understand the impacts and can understand the best actions to be taken in favour of the local flora and fauna 

Watch the video below to find out how monitoring is done:

Mouse over the map to see more details

Aquatic Biodiversity 

Currently, the study area of aquatic communities on the Paraopeba river ranges from the Salto do Paraopeba Small Hydroelectric Plant, in Jeceaba, to beyond the Três Marias dam. 

After studies by experts from government institutions, 35 points were selected for aquatic monitoring, in affected and unaffected areas.

In the river, we monitor fish, aquatic insects and microscopic plant and animal organisms, known as plankton, using the following methods: 

  • Collection of sediment from the bottom with specific equipment, such as a dredger; 

  • Manual collection of rocks and leaves that are at the bottom; 

  • Trawl for plankton collection; 

  • Collection of aquatic plants, the so-called “macrophytes”; 

  • Collecting fish with nets, nets and other equipment.

The reparation so far

At the end of December 2019, Vale started the Aquatic Biodiversity Monitoring Program, following the guidelines presented by the Minas Gerais State Forestry Institute (IEF).
In 2020, tailings were removed at the mouth of the Ferro Carvão stream’s estuary, from the Alberto Flores Bridge to the confluence of the Ferro Carvão stream’s estuary with the Paraopeba river. The stabilization of the banks of the creek and the reconstitution of its gutter was also carried out; 
seta-direita scroll-to-see-more

Fish 

To study the species, samples are collected using cast nets, nets, trawls and sieves. After collection, the fish are processed, tagged, have their biometric data recorded and are studied in laboratories. 

Fish from the Paraopeba river basin are also monitored during piracema, when they reproduce. In this way, when schools swim against the current to release eggs, between the months of November and February, they are monitored in order to detect possible changes in fish reproduction. 

  • Histopathological analysis – Procedure performed to assess possible diseases or damage to fish due to exposure to waste arising from the break. 

  • Helmintofauna Assessment – This procedure assesses the presence of parasites as bioindicators for monitoring environmental impact. 

  • Bioaccumulation of metals – Procedure in which animals undergo identification, biometrics and removal of muscle and liver, to verify the presence of metals such as aluminium, copper, iron, lead, zinc, among others. That is, we check whether there are high concentrations of a particular chemical in organisms at the highest level of the food chain; 

  • Toxicology and genotoxicity in fish and aquatic invertebrates – scientific studies that analyse the effects of chemical substances on organisms and their ability to induce alterations in the genetic material of animals that have been exposed to them.  

Important 

On February 28, 2019, fishing for native species was prohibited in the Paraopeba river basin, by Ordinance No. 16 issued by the State Forestry Institute (Instituto Estadual de Florestas – IEF), and this continues until the publication of a new Ordinance. 

Planktonic communities 

The technical team also studies planktonic communities (formed by different microorganisms), which have some important bioindicators. These bioindicators are sensitive to pollution and help us to verify that the physical, chemical and biological parameters of the river water are adequate. The collections of these microorganisms are carried out with plankton nets and the analyses are carried out in the laboratory, using a microscope.

Phytoplankton  – A group of photosynthetic microorganisms composed of microscopic unicellular algae and cyanobacteria that live dispersed in water.
Zooplankton – Set of aquatic organisms, usually microscopic, that do not carry out photosynthesis and live dispersed in the water column. Includes protozoa, worms, crustaceans, among others.
Periphyton – A set of organisms that attach to solid surfaces and can form a thin layer on these surfaces in aquatic habitats . Their size ranges from microscopic organisms to some several meters in size.
Zoobenthos – Set of organisms that live in water during at least one phase of their life cycle and that are larger than 0.5 mm; hence they are called macroinvertebrates. Insect larvae, crustaceans and molluscs are some examples of these organisms.

Aquatic biota of the Ferro-Carvão stream basin 

As part of the monitoring, we follow the aquatic biota , that is, the set of aquatic living beings, from the Ferro-Carvão stream basin. For this, we studied different groups of animals, including aquatic invertebrates and fish. 

For the collection of fish samples, 10 points were defined in the tributaries of the stream. For the collection of aquatic invertebrates, three streams from the Ferro-Carvão basin and other watercourses in nearby basins with similar hydrological characteristics are sampled. This monitoring seeks to assess the possible loss of interaction, also called loss of ichthyofauna connectivity, between the species existing in the Ferro-Carvão basin. Delete 'what do we evaluate?' 

Terrestrial biodiversity 

button-next button-next

In the forest areas of the Ferro-Carvão river basin and surrounding areas, and on the banks of the Paraopeba river, the technical teams analyse the cycle of nutrients in nature, the composition and structure of the vegetation and various animal species (selected as bioindicators) present there. The main study methods used are:

Survey and monitoring of populations of chinstrap tortoise(Phrynopsgeoffroanus),capybara (Hydrochoerus hydrochaeris), and endangered species : tern (Pygochelidonmelanoleuca), riverside butterfly (Parides burchellanus) and otter (Lontra longicaudis);
Sampling of terrestrial invertebrates (through specific methodologies for each study group);
Opening of trails and transects with the installation of pitfall traps for sampling amphibians and Squamata reptiles and small non-flying mammals;
Installation of live capture traps for sampling small non-flying mammals, mist nets for sampling bats and sampling points for birds from the interior of the forest; 
Marking and sampling of botanical plots for monitoring phytosociological parameters (i.e., the study of the plant community, its floristic composition and vegetation structure);
Collection of blood and fur from wild animals for laboratory studies.
seta-direita scroll-to-see-more

The reparation so far 

More than 500 thousand meters of fence were placed in the Permanent Preservation Areas of the Paraopeba river basin, an important measure to guarantee the growth of the vegetation present in spaces close to water courses; 
Use of bioengineering techniques to reclaim soil and control erosion; 
More than 129 wild animals carefully returned to nature and in accordance with the appropriate technical and legal procedures; 
More than 200 professionals, including biologists, veterinarians, environmental engineers and field assistants dedicated to the rescue of animals, care and preparation for reintegration into nature; 
Execution of the revegetation project at Ground Zero , which will plant 4,000 seedlings of tree species native to the region; 
Around 1,500 domestic and 200 wild animals have passed through and were taken care of at the Fauna Shelter Farm in Brumadinho, by the end of June 2021.  
seta-direita scroll-to-see-more
Pets were also impacted by the B1 dam failure. Dogs, cats and farm animals were rescued from the affected areas, in community homes or left by voluntary donation. In addition to the shelter, our technical team provides all the necessary care and animals that do not have a guardian are available for adoption.

Wild animals - such as birds, snakes, tortoises, opossums, among others - found in the areas of emergency works are captured and clinically evaluated. The rescue and rescue actions are carried out respecting all protocols and measures of capture and containment, according to the fauna group to which it belongs (amphibians, reptiles, birds or mammals). All procedures aim to ensure the animal's well-being and safety, always seeking the best destination for each individual. If they are in good condition, they are immediately released into their natural habitat . If they need veterinary treatment that requires a period of hospital stay, they are sent to the Fauna Shelter Farm, in Brumadinho/MG, where they are housed in roomy environments that respect the specificities of their biology and ecology. 

These animals are monitored by specialists who perform various procedures: laboratory tests, balanced nutrition to aid in physical and behavioural recovery, muscle training, among others. They can also be sent to the Wild Fauna Rehabilitation and Reintroduction Program, where tests and training are carried out for the development of abilities and skills for survival in a natural environment. 

Once rehabilitated, animals in good condition are reintegrated into their natural environment. Those who do not have the capacity for rehabilitation or release are referred to an institution that is capable of maintaining their physical and psychological well-being throughout their life in captivity, such as a breeding, maintenance or zoo. All these actions are in compliance with current environmental standards and are authorized by the environmental agency.

Exotic wild animals rescued or captured undergo the same veterinary care, however, they are not reintroduced into the wild. After the treatment has been carried out, Vale decides with the environmental agency which is the best destination for the exotic animal. 

Botanical Monitoring 

In order to assess whether there was an impact on vegetation beyond the area directly affected by the tailings, botanical studies are carried out to monitor, among other things, possible changes in the structure of the vegetation and in the diversity of species.

For this monitoring, plots are marked on plots installed in forested areas close to the tailings patch and also in areas far from the tailings for comparison purposes. These locations are monitored over time to verify whether the proximity to the tailings will generate any long-term impact and, if so, what are the best mitigation measures.

Rescue of plant species 

The impacted vegetation is receiving a contribution from technology for its recovery. A technique developed by researchers at the Federal University of Viçosa (Universidade Federal de Viçosa – UFV)”, capable of rescuing DNA and creating copies of plants in the region, has begun to be applied for forest rehabilitation in the area. Trees that could take more than eight years to flower should start this process between six and 12 months, which will help to accelerate the recovery of biodiversity in the region. Genetic material has already been collected from five pre-selected species, including endangered species such as Stephanopodium engleri, braúna (Melanoxylonbrauna) and caviúna (Dalbergianigra)and protected by law, such as the yellow ipe (Handroanthus serratifolius). Part of the seedlings produced from the recovered material were planted in the impacted area in the first months of 2021. 

Revegetation - Ground Zero Project 

In December 2020, Vale completed the first stage of the Ground Zero project, which involved forest restoration work such as: seed collection, seedling production, acclimatization and planting in areas to be recovered at the mouth of the Ferro-Carvão stream's estuary. Other ecological restoration techniques used were nucleation (which forms favourable microhabitats to attract species and accelerate the process of succession and local diversity), through the installation of artificial perches and soil transposition; which will also contribute to the recovery process in the medium term. At the end of the restoration work, the Ground Zero area will have around 4,000 seedlings of tree species native to the region. 

Galery

button-next button-next
Flock of collared swallows (Pygochelidon melanoleuca). Photo: Afonso Carlos Oliveira.
Phyllomedusa burmeisteri (leaf frog), an amphibian recorded during biodiversity monitoring. Photo: Hans Thomassen.
Scinax luizotavioi (pererequinha), an amphibian recorded during biodiversity monitoring. Photo: Hans Thomassen
Dendropsophus elegans (frame-perereca), an amphibian recorded during biodiversity monitoring. Photo: Hans Thomassen..
Enyalius bilineatusI (little chameleon), lizard recorded during biodiversity monitoring. Photo: Hans Thomassen.
Enyalius bilineatusI (little chameleon), lizard recorded during biodiversity monitoring. Photo: Hans Thomassen.
Otter footprints (Otter longicaudis). Photo: Ana Yoko Meiga.
Micronycteris megalotis, bat recorded during biodiversity monitoring. Photo: Jeanneson Sales
Artibeus lituratus, bat recorded during biodiversity monitoring. Photo: Jeanneson Sales.
Cuíca-graciosa (Gracilinanus agilis), captured and released after the installation of the identification earring. Photo: Rodolfo Stumpp.
Bearded tortor (Phrynops geoffroanus), captured and released after marking, for population monitoring. Photo: Aline Costa.
Capybaras (Hydrochoerus hydrochaeris) on the bank of the Paraopeba river. Photo: Ana Yoko Meiga.
seta-direita scroll-to-see-more

The activities are being carried out in full compliance with legislation and are monitored through meetings, field visits and reports by various public bodies. Depending on the case, one or more of the institutions below are responsible for issuing authorizations. No action is performed without proper authorization or follow-up. 

  • State Forestry Institute (Instituto Estadual de Florestas – IEF) 

  • Prosecution Office of The State of Minas Gerais (Ministério Público de Minas Gerais – MPMG) 

  • Water Management Institute of Minas Gerais (Instituto Mineiro de Gestão de Águas – IGAM) 

  • State Environmental Foundation (Fundação Estadual de Meio Ambiente – FEAM) 

  • State Department for Environment and Sustainable Development (Secretaria de Estado de Meio Ambiente e Desenvolvimento Sustentável – SEMAD) 

  • Brazilian Institute of Environment and Renewable Natural Resources (Instituto Brasileiro do Meio Ambiente e dos Recursos Naturais Renováveis – IBAMA) 

  • Chico Mendes Institute for Biodiversity Conservation (Instituto Chico Mendes de Conservação da Biodiversidade – ICMBio) 

In addition to the team of specialists working in the field, we have monitoring and reparation techniques developed by researchers and professors from the following partner institutions: 

  • Federal University of Minas Gerais (Universidade Federal de Minas Gerais – UFMG) 

  • Federal University of Viçosa (Universidade Federal de Viçosa – UFV) 

  • Federal University of Ouro Preto (Universidade Federal de Ouro Preto – UFOP 

  • State University of Minas Gerais (Universidade Estadual de Minas Gerais – UEMG) 

  • Federal University of Juiz de Fora (Universidade Federal de Juiz de Fora – UFJF) 

  • Federal University of Triângulo Mineiro (Universidade Federal do Triângulo Mineiro – UFTM) 

To this end, we remain committed to carrying out actions to monitor local biodiversity, such as water, soil and animals, in addition to carrying out activities aimed at the revegetation of affected areas. 

We are also committed to ensuring quality water for populations that depended on abstraction from the Paraopeba River.  
Photographer: Vale's Archive
Onda

Discover our areas of activity:

button-next button-next

Biodiversity monitoring

Aquatic biodiversity

Terrestrial biodiversity

Botanical Monitoring 

Recovery of plant species

seta-direita scroll-to-see-more

Photographer: Ricardo Teles

Water supply

After the collapse of Dam B1, in Brumadinho, the use of water from the Paraopeba River was interrupted and Vale assumed a commitment, together with the competent public bodies, to ensure the water supply of all affected municipalities.

For this, we carry out corrective actions (aimed at animal consumption, agricultural irrigation and human consumption) and preventive actions (to ensure water security and adequacy in public supply).

So far, Vale has provided a flow rate of: 

204,060,040

L/day for public supply 

Volume of mineral water supplied to communities 

19,306,838

million liters 

Volume of water made available by drilled wells 

2,384,773,800

of liters 

In a total of: 

3,586,476,649

Liters 

Photographer: Vale's Archive

Discover the actions being carried out 

The action seeks to ensure quality water for the population living in the areas between Brumadinho and the Três Marias reservoir.
Among the initiatives for preventive actions, there is the installation of a containment barrier that surrounds the Bela Fama water withdrawal, in Nova Lima. The barrier is about 3 meters high and 300 meters long and its works were completed in December 2019. 
We are developing projects to ensure that the water demand of RMBH corresponds to 15,000 l/s. 
The Commitment Agreement also includes the preparation of the project for a treated water pipeline with approximately 30 km in length. It will connect two reservoirs (R10-R13), increasing the transfer between the Paraopeba and Velhas river water systems.  
We are also developing studies and projects for the implementation of a new water withdrawal in the Velhas river, in the Ponte de Arame region.  
The scope also includes water withdrawal in Ribeirão da Prata, which includes run-of-river water withdrawal and a 9 km pipeline to the ETA Bela Fama.

Do you want more information about the public supply schedule via water trucks? 
To learn more about requesting the supply of drinking water via water trucks, call the Call Center: 0800 031 0831. 

The data obtained from the monitoring works is periodically delivered to inspection agencies and to the Public Presecution Office of Minas Gerais. 

To discover the official technical results, visit our transparency area

Fotógrafo:

The activities are being carried out in full compliance with the legislation and are monitored through meetings, field visits and reports by various public bodies. No action is taken without the authorization of the competent institutions.

Fotógrafo: Ricardo Teles

Paraopeba river water quality 

The restoration of the Paraopeba River is one of the main commitments of our environmental reparation work.

Since the reparation of Dam B1, in Brumadinho, in addition to the monthly monitoring carried out by the Minas Gerais Water Management Institute (Igam), we have monitored the quality of the waters of the Paraopeba River and its tributaries. The data obtained from the monitoring works is periodically delivered to inspection bodies and to the Public Presecution Office of Minas Gerais. 

What are the results obtained so far? 

  • Since May 2019, the Paraopeba River has not received tailings loading; 
     
  • The tailings did not reach the São Francisco River. The impacts on water quality were identified up to the limit with the Retiro Baixo Hydroelectric Power Plant, in Pompéu (MG);
     
  • No impacts were detected on the waters of the Três Marias Hydroelectric Power Plant reservoir, as demonstrated in studies by environmental agencies;
     
  • The turbidity levels and the total metals, Manganese, Iron and Aluminum, are progressively reducing during the dry period, and statistical trend tests prove an improvement in the water quality of the affected regions.
Photo: Vale's Archive