Close

Vale employee smiling in green landscape. She is wearing a green Vale
uniform, goggles, helmet and ear plugs. Visual wave artifact Vale
A woman in an operation area with machines in the background. She is wearing a Vale uniform, a light green and gray overalls with fluorescent markings, goggles, gloves, mask, helmet, and ear protection.
Photographer: Ricardo Teles
A man is smiling in an operation area. He is wearing a light green Vale button-up shirt, white helmet, and goggles.
Photographer: Ricardo Teles

We believe that our work only makes sense if it generates value for society.

Therefore, we also operate in the energy segment.

About 80% of the energy consumption of our operations in Brazil is supplied by our own generation, with emphasis on hydroelectric, solar and wind sources. 

Learn more about energy in our company: 

Assets and stakes

In addition to our own energy generation, our portfolio includes stakes in hydroelectric power plant consortia and in energy generation and commercialization companies.

Two men talking in an operation area. One of them is holding a clipboard. Both are wearing light green Vale button-up shirts, goggles and helmets.

Photographer: Lucas Lenci

Brazil

We have three own hydroelectric power plants (PCHs), as well as stakes in consortia of three plants and two generation companies. 

Brazil's map with some states pointed out Vale-Per-7-desk
Two men smiling in an operation area with a truck wheel in the background. One of them is holding a tool. They are wearing light green and gray Vale overalls with fluorescent markings, gloves, goggles, white helmets, and ear protection.

Photographer: Lucas Lenci

Understand more details about PCHs: 

Photo of Mello SHP from above, one part of the photo with vegetation, mountains and trees and the other with water

PCH Mello

Iron structures in the shape of pipes and huge machinery.

PCH Glória

Iron structures in the shape of pipes and huge machinery.

PCH Nova Maurício

Iron structures in the shape of pipes and huge machinery.

UHE Candonga

Iron structures in the shape of pipes and huge machinery.

UHE Estreito

Photo of the Machadinho Hydropower Plant with a concrete structure and moving water passing through the structures.

UHW Machadinho

Scroll to see more

Understand more details about generation companies:

Aliança Geração

Aliança Geração de Energia is a partnership between us and Cemig, to operate in the energy sector in Brazil. Starting to operate in 2015, Aliança is among the main private generators in the country.
Icon representing a hydroelectric plant

7 hydroelectric

power plants in their entirety or in consortia
Icon representing a turbine

99  MW

of installed wind capacity
Icon representing a flash

1257 MW

of installed capacity (number refers to Aliança Geração's stake in the project)
Icon representing a hand shake

55%

Our company and 45% of Cemig, in its corporate structure

Aliança Norte Energia 

Also as a result of the partnership with Cemig, Aliança Norte owns 9% of the Belo Monte Hydroelectric Power Plant. The plant is located in the state of Pará, and comprises the Pimental (233 MW) and Belo Monte (11,000 MW) sites. It is the largest 100% Brazilian hydroelectric power plant, and the 4th largest in the world. 
Icon representing a hydroelectric plant

9%

of the Belo Monte hydroelectric power plant
Icon representing a certificate

411 MWm

of physical guarantee*
Icon representing a flash

1011 MW

of installed capacity (number refers to Aliança Norte's stake in the project)
Icon representing a hand shake

51%

Our company and 49% Cemig, in its corporate structure

For us, life always matters most.  

Therefore, the dams of our hydroelectric power plants undergo regular inspections and safety assessments, in accordance with the legislation. The activities are verified by specialized consultants and the results are registered with the competent authorities.

In Brazil, all of our dams have Dam Safety Plans (PSB) and Emergency Action Plans (PAE) filed with the respective city halls. 
Belly to head shot of a woman talking in a radio in an operation. The woman is leaning on a railing and is wearing a Vale uniform, helmet, goggles, gloves, ear protection and mask on her face. Photographer: Ricardo Teles
Onda

Canada

We have five hydroelectric power plants (PCHs) in Canada that are responsible for generating approximately 20% of the electricity demand of our Sudbury operations. 

Following our standard of inspections and safety assessments, in the province of Ontario, our dams are operated and maintained in accordance with best practices outlined in the Ontario Ministry of Natural Resources' (MNR) Lakes and River Improvement Act, and by the Water Management Plan of the Espanhol and Vermillion rivers, where the hydroelectric power plants are located.
Photo of two women, one is holding a small piece of equipment and the other a notebook with a pen. The two are wearing orange overalls, gloves, white helmets, and goggles.

Photographer: Lucas Lenci

Understand more details about PCHs:

Photo of High Falls small hydropower plant. A shed structure with bricks and windows, and under the structure three water passages.

PCH High Falls I 

Photo of High Falls small hydropower plant II. A structure with bricks and windows on a bridge and underneath a river flowing.

PCH High Falls II 

Photo of Big Eddy small hydropower plant with a concrete structure and water.

PCH Big Eddy 

Photo of Wabageshik small hydropower plant with a concrete structure, rocks, vegetation, and moving water passing through the structures.

PCH Wabageshik 

Photo of Wabageshik small hydropower plant with a concrete structure, rocks, vegetation, and moving water passing through the structures.

PCH Nairn 

Scroll to see more

Indonesia

Our daily work, built with you, is based on a fundamental pillar: respecting and caring for our planet. In Indonesia, we produce nickel, which includes the operation of three hydroelectric plants in the country: Larona, Balambano and Karebbe.

In Indonesia, all of our dams have received a Dam Safety Certificate by the Dam Safety Commission, as requested by the country's Ministry of Public Works. 
Photo of Wabageshik small hydropower plant with a concrete structure, rocks, vegetation, and moving water passing through the structures.

Photo: Vale Archive

Understand more details about the plants: 

Photo of Wabageshik small hydropower plant with a concrete structure, rocks, vegetation, and moving water passing through the structures.

UHE Larona

Photo of Wabageshik small hydropower plant with a concrete structure, rocks, vegetation, and moving water passing through the structures.

UHE Balambano

Photo of Wabageshik small hydropower plant with a concrete structure, rocks, vegetation, and moving water passing through the structures.

UHE Karebbe

Scroll to see more

Consumption

Our biggest consumption is in electricity, especially in Brazil, Indonesia, Canada and , and in diesel. Do you know why? They are used primarily as fuel in off-highway trucks, which are fundamental to our operations, and in our railroad locomotives.

A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.
Photo of Wabageshik small hydropower plant with a concrete structure, rocks, vegetation, and moving water passing through the structures. Photographer: Ricardo Teles
Onda

Learn more about our strategy in search of a sustainable future for all of us: 

Icon representing a triangle with arrows
Replacement of conventional sources of energy by the Company’s own renewable generation;
Icon representing a flash
Electrification of diesel machinery and equipment; 
Icon representing a certificate
Systematized management model to achieve high energy performance throughout our production chain. 
Photo of Wabageshik small hydropower plant with a concrete structure, rocks, vegetation, and moving water passing through the structures.

Photographer: Daniel Mansur

Energy efficiency

We have an Energy Efficiency Program in our operations with the objective of multiplying good energy consumption management practices throughout the company. 

Being energy efficient is essential to taking care of our planet and achieving our sustainability goals. In the program, we create the necessary conditions to seek improvements in energy performance through: 
 
  • Standardization of energy management processes;

  • Transparency in performance management;

  • Multidisciplinary teams for the implementation and management of the Program;

  • Use of automated energy measurement and management system.

Transmission and distribution 

In our operations in Brazil, we have our own lines and substations. In addition, we maintain collaboration with the concessionaires to which we are connected. 

Wave