Vale launches pilot project for environmental recovery of the impacted area
-
Who we areGo Back
Who we are
We are a global company, that practices sustainable mining in the countries where we are present. We exist to improve life and transform the future. Together.
Access the page Who we are
-
What we doGo Back
What we do
We extract ore and transport it through a a complete logistics chain, which includes railroads and ports. In our activity, we prioritize the safety of people and the environment, acting with respect, care and integrity.
Access the page What we do
Access the page Mining
Go BackMining
Iron ore is present in the solutions that transform people's lives, contributing to the evolution of society. Today we are the largest producer of iron ore and nickel in the world, in addition to operating in other segments. Come and discover each product and its curiosities.
Access the page Mining
Access the page Where are we
Go BackWhere are we
Access the page Brazil
Go BackBrazil
Click on the states below to learn more about our performance in each location.
Access the page Brazil
-
Our peopleGo Back
Our people
People are at the center of our decisions. We value individual talent and seek to be more diverse and inclusive, acting with respect and practicing open dialogue.
Access the page Our people
Access the page Proud to be Vale
Go BackProud to be Vale
We are made by people and for people. With each job done, we receive a new opportunity to transform our work environment and the world we live in. Get to know our action fronts.
Access the page Proud to be Vale
Access the page Opportunities for professionals
Go BackOpportunities for professionals
Our recruitment process has been changing and is in line with the cultural transformation we are going through. Access the job vacancies portal and come be part of this history.
Access the page Opportunities for professionals
Access the page Opportunities for students
Go BackOpportunities for students
Have you ever thought about starting your professional life at a company that invests in people and in a transparent and inclusive work environment? Get to know our Internship and Professional Training Program.
Access the page Opportunities for students
-
InvestorsGo Back
Investors
We work with transparency for those who already invest with us or are thinking of becoming part of our investor base. Access documents, quotes, and key indicators of our business.
Access the page Investors
Access the page Information to the market
Go BackInformation to the market
Follow our events calendar, access documents and the main Vale’s financial reports.
Access the page Information to the market
-
SuppliersGo Back
Suppliers
We believe that business partners are essential to live our purpose, to improve life and transform the future - together. Learn about our guidelines to be part of our supply chain.
Access the page Suppliers
Access the page I'm a Supplier (Brazil only)
Go BackI'm a Supplier (Brazil only)
We seek to work with a chain of suppliers that contribute to a more ethical and fairer society. Our relationships are based on honesty, dialogue and transparency. Learn more about our materials and services.
Access the page I'm a Supplier (Brazil only)
-
Our FutureGo Back
Our Future
We want to transform the future. For this reason, we are already working with local communities and different sectors of society with the aim of leaving a positive social, economic, cultural and environmental legacy. Discover our initiatives.
Access the page Our Future
Access the page Culture
Go BackCulture
We believe that living the culture makes it possible for people to expand their knowledge and create new perspectives for the future. In this regard, for over two decades Vale has invested in and fostered the multiple Brazilian cultural manifestations.
Access the page Culture
Access the page Sustainability
Go BackSustainability
We think, dialogue, design and build, together, a future for mining and for the planet, while taking care of the present. Learn more about our commitments to sustainability.
Access the page Sustainability
Access the page Innovation
Go BackInnovation
Innovation is one of the main pillars for achieving our purpose. We use technology to redesign our ways of working. Learn how.
Access the page Innovation
-
ReparationGo Back
Reparation
We will never forget Brumadinho. We have learned from our history and we are committed to the full reparation of the communities and people impacted by the dam collapse, in accordance with the signed legal agreement.
Access the page Reparation
Recent searches
Quick Links
- Home
- Who we are
- What we do
- Projeto Bacaba
- Mining
- Dam Elimination
- Energy
- Logistics
- Canada
- Voisey's Bay
- Port Colborne
- St. John's
- Thompson
- Toronto
- Sudbury
- Careers in Canada
- Long Harbour
- Safety Data Sheets
- Products
- Greater Sudbury Air Quality
- Oman
- Japan
- Brazil
- United Kingdom
- Malaysia
- China
- Pará
- Espírito Santo
- Maranhão
- Minas Gerais
- Rio de Janeiro
- Dams
- Programa de Descaracterização
- Itabira
- A Vale em Nova Lima
- Itabira
- A Vale em Barão de Cocais, São Gonçalo do Rio Abaixo, Santa Bárbara e Rio Piracicaba (MG)
- A Vale em Ouro Preto, Catas Altas e Mariana (MG)
- Our people
- Proud to be Vale
- Global opportunities
- Opportunities for students
- Opportunities for professionals
- Diversity
- Vale’s Health Insurance Scheme
- Investors
- Check out our company
- Corporate Governance
- Information to the market
- Announcements, Results, Presentations and Reports
- Dividends, Debts and Debentures
- Contacts
- Relatório Financeiro 4T23
- Suppliers
- I'm a Supplier
- Payment status
- Requesting pickups
- Schedule deliveries
- Mobilization and Demobilization (ERRO)
- How to measure
- Registration of suppliers
- Receiving and returning quotes and orders
- Treatment of discrepancies in orders and tax invoices
- How to send invoice
- Inove Capital
- Mobilization and Demobilization
- Be a supplier
- Partilhar Program
- Our Future
- Reparation
- Indemnity
- Environment
- Social
- Economy
- Adoção de animais antigo
- Monitoring Plan for Emergency Works
- Dashboard Waste Management
- adoção-testes
- Animal Adoption
- Vale now
- All News
- Transform Together
- Vale will start tests to implement autonomous operation in off-road trucks in Carajás
- 50 years of partnership between Vale and China
- Programa de Aceleração de Mulheres Negras
- Snolab
- Reserva Natural Vale divulga programação para novembro
- 2022 Extraordinary Meeting of Shareholders
- Instituto Cultural Vale celebra Maria Firmina dos Reis e leva o Maranhão à 20ª FLIP
- At a UN event, Malu Paiva highlights projects supported by the Vale Foundation to generate income for women in high social vulnerability
- Vale: for 80 years transforming the future
- Vale 80 years: discover stories of those who help us write ours
- 80 anos Vale: como chegamos até você
- Plano Diretor Ambiental de Tubarão
- Reserva Natural Vale divulga programação para dezembro
- Vale Day 2022 in New York
- 80 anos Vale: para além da mineração
- Dia Internacional Contra a Corrupção: nossos executivos lembram a importância do tema
- Projeto das novas pontes sobre o Rio Tocantins, em Marabá (PA), contribui para desenvolvimento socioeconômico da região
- Programa Valorizar premia organizações sociais de Barão de Cocais e Santa Bárbara
- Conheça a cultura do Pará na websérie “Papo de Raiz”
- Vale to hold event at United Nations Water Conference
- Reserva Natural Vale divulga programação para janeiro
- 4Q22 Sales and Production report
- Reserva Natural Vale divulga programação para fevereiro
- Energia para transformar o futuro: assista aos novos episódios de “Juntos para Transformar” no YouTube
- Check out the 4Q22 Financial Results
- Women who transform science and inspire new professionals
- PT Vale and PT BNSI Inaugurate the Construction of the Integrated Low Carbon Nickel Mining and Processing Project in Morowali
- Viva Engage Vale
- Museu Vale apresenta exposição sobre Leonardo Da Vinci
- Annual and Extraordinary Meetings of Shareholders
- Alteração nas alíquotas de ICMS
- Confira as operações no Maranhão que voltarão a ser tributadas pelo ICMS a partir de 1º de abril
- A nova edição do Balanço Vale+ já está disponível!
- 1Q23 Sales and Production report
- Check out the 1Q23 financial report
- Programa Valorizar premia instituições em 8 municípios
- Nova sede da Escola Municipal Meridional será entregue no começo do segundo semestre
- TRSP Requirements and Application Form
- TCA Praia de Camburi
- Chamada Instituto Cultural Vale
- 1º Edital Uso Futuro MAC
- Programa de Descaracterização de barragens a montante avança
- Obras de descaracterização começam em mais uma estrutura a montante da Vale: o Dique 1A
- Participe da etapa de Capacitação do Programa Valorizar – Caeté (MG)
- Reorganização de Metais Básicos no Brasil: fornecedores devem ficar atentos aos novos CNPJs
- Circuito Corrida Vale 2024 – Juntos para transformar
- 2Q23 Sales and Production report
- Conselheiro Lafaiete recebe novo prédio da Escola Municipal Meridional
- Check out the 2Q23 Financials Results
- Festivais de Inverno em Minas Gerais
- Reorganização de Metais Básicos no Brasil: Confira o procedimento para Retorno de Conserto de Materiais enviados no CNPJ Vale anterior
- Vale promove nova edição do Programa de Preparação para o Mercado de Trabalho
- Prêmio Valor Inovação 2023 elege a Vale como a mais inovadora do setor de Mineração
- Bienal das Amazônias reunirá mais de 120 artistas
- Festival Vale Amazônia
- Fluxos para solicitação de reanálise de indenizações por danos à saúde mental em Brumadinho
- Projeto MAC Uso Futuro
- Balanço Vale+: Edição 1º Semestre de 2023
- Programa de Preparação para o Mercado de Trabalho chega em Ourilândia do Norte e Região
- Indonesia Sustainability Forum 2023
- Vale abre inscrições para o Programa de Preparação para o Mercado de Trabalho (PPMT) em Canaã dos Carajás
- Check the 3Q23 performance report dates
- Iron Ore Briquettes
- The 3Q23 sales and production report
- Resultados de vendas e produção 3t23
- Check out the 3Q23 Financials Results
- Amazon
- Resultados do Edital Uso Futuro
- Vale Day 2023 London, UK
- Vale Day 2023 London, UK 2
- Vale Day 2023 London, UK 3
- 4Q23 sales and production report
- Check out the 4Q23 performance report dates
- Reserva Natural Vale divulga programação para Fevereiro
- Movimentações em janeiro: saiba quais foram as mudanças no nosso time no início de 2024
- Check out the 4Q23 Financials Results
- 2024 Annual and Extraordinary Shareholders' Meetings
- Projeto Apolo
- Simulado de Segurança de Barragens - Itabira Eixo Norte
- Vale patrocina a Festa da Penha e encanta fiéis com ações especiais
- 1Q24 Production and Sales report
- Programa para pessoas recém-formadas em Engenharia
- Check out the 1Q24 performance report dates
- Check out the 1Q24 Financials Results
- Simulado de Segurança de barragens da mina de Águas Claras, em Nova Lima
- Programa Valorizar 2024: Barão de Cocais e Santa Bárbara
- Programa Desenvolver
- Inscreva-se para o processo seletivo do Programa de Preparação para o Mercado de Trabalho
- Juntos pelo Rio Grande do Sul
- Discover your realm of possibilities
- See the mining in your life
- Descaracterização da barragem B3/B4
- Atenção fornecedor: aprenda a identificar quando um e-mail em nome da Vale é verdadeiro
- We are committed to building a better Manjung through impactful social investments
- Reserva Natural Vale divulga programação para julho de 2024
- Nova estrutura da contenção a jusante no Sistema Pontal
- 2Q24 Vale’s Performance
- 2Q24 performance report dates
- Check out the 2Q24 Financials Result
- Mais segurança: Barragem Sul Superior deixa nível máximo de emergência
- 2024 Extraordinary Shareholders’ Meeting
- Estágio de Nível Superior para Metais Básicos - Exclusivo Pará
- Confira a programação de agosto do Parque Botânico São Luís
- Reserva Natural Vale divulga programação para agosto
- Vale é destaque em eficiência energética em podcast do MIT Technology Review
- Vale ganha o primeiro lugar do Prêmio Valor Inovação 2024 como a mais inovadora do setor de Mineração, Metalurgia e Siderurgia
- Vale abre inscrições para o Programa de Preparação para o Mercado de Trabalho (PPMT) em Canaã dos Carajás
- Participe da Corrida e Caminhada Metais Básicos
- Confira a programação de setembro do Parque Botânico São Luís
- Parque Costeiro
- Inscreva-se para o processo seletivo do Programa de Preparação para o Mercado de Trabalho em Mangaratiba, Rio de Janeiro
- 3
- Confira a programação de outubro do Parque Botânico Vale
- Confira a programação de outubro do Parque Botânico Vale
- 3Q24 performance report dates
- Parceria + Segura: Vale promove Evento de Premiação e Reconhecimento de Fornecedores
- Vale abre 20 vagas na área de Tecnologia e Inovação em três estados do Brasil
- Check out the Production and Sales results for 3Q24
- Check out the 3Q24 Financial Results
- Confira a programação de novembro do Parque Costeiro
- Vale day 2024
- Confira a programação de dezembro do Parque Botânico Vale
- Confira a programação de dezembro do Parque Costeiro
- Confira a programação de janeiro do Parque Botânico Vale
- Confira a programação de janeiro do Parque Costeiro
- Press Releases
- Our stories
- Travel with us
- Vale Botanical Parks and Spaces
- Fazenda Marinha Project
- Vale Botanic Park in São Luís
- Vale Natural Reserve
- Biopark Vale Amazônia
- Vale Botanical Park Vitória
- Passenger train
- History Center
- Transparency
- Document library
- Speak with Valebackup
- Whistleblower Channel
- Privacy at Vale
- Aviso externo de privacidade
- Aviso externo de privacidade Japan
- Aviso externo de privacidade Malasia
- Aviso externo de privacidade Europa
- Aviso externo de privacidade China
- Aviso externo de privacidade Oman
- Aviso externo de privacidade Singapore
- Push notifications
- Code of Conduct
- formssucesso
- Speak with Vale
- Under construction
- link teste
- investidoresbk
- Compromisso de enfrentamento à pobreza
- Search center
- Accessibility
- Admin
- Indonesia
- About PT Vale
- Our history in Indonesia
- Indonesia Growth Projects
- Our Organization
- All News
- Awards and Certifications
- Sejarah kami di Indonesia
- About PT Vale Indonesia
- Governance
- Investors
- Major and Controlling Shareholders
- Annual and Sustainability Reports
- Financial Statements
- Financial Highlights
- General Meeting of Shareholders
- Shares Information
- Dividend
- Capital Market Supporting Institutions and/or Professionals
- Press Releases
- Prospektus
- Prospektus
- Sustainability
- Environment
- Emission
- Biodiversity
- Post Mining Rehabilitation
- Waste
- Water and Effluent Management
- Sawerigading Wallacea Biodiversity Park
- Social
- Our People
- Practical Work and Student Research
- Co-Ops Program
- Community
- Human Rights
- Social Development Program
- Occupational Health and Safety
- Covid-19
- Diversity, Equity, Inclusion
- East Luwu Community Scholarship
- Sustainabillity Report 2022
- Sustainability Report
- SR Backup
- Transparency and Policies
- Careers
- ESG
- ESG Governance
- ESG Strategy
- ESG Risk Management
- ESG Risk Assesment
- ESG Roadmaps
- ESG Flagship Programs
- Dongi Resettlement
- Organic SRI Rice
- Scholarship Anak Asuh
- Promoting Health and Preventing Sickness
- Female Hiring and Female in Leadership
- Unwavering Commitment in Ensuring Adequate Working Conditions
- Labor Union
- Local Talent Development Program
- Utilization of Used Oil as Fuel in Dryers and Reduction Kilns
- Clean Water Initiative
- Operation of Electric Boilers to eliminate MFO
- Progressive Reclamation to Transform the Post-Mined Lands
- Hydropower Plant Supply Alternative Route Program for Auxiliary Grid (ROJALI)
- Wellness Wonders: Energizing Health and Safety Pursuits in Local Communities
- Wellness Program
- Integrating Safety in Every Operation of Our Company
- ESG Target
- ESG Performance and Updates
- ESG Ratings and Awards
- Shareholder information
- Opportunities in Indonesia
- Vale News Archive
- Vale Release Archive
- Base Metals
- ESG
- Our Approach
- Sustainable mining
- Nature
- Waste management
- Circular mining
- Mine closure and Future Use
- Water and effluents
- Biodiversity
- Air emissions (non-GHG)
- Environmental compliance
- Climate
- Social
- Reparation
- Dams
- Controversies
- Document Library
- Last updates
- testeesg
- Redirecionamentos ESG
- Teste filtros
- Aviso externo de privacidade Malasia bahasa
- Vale day
•
Vale launches pilot project for environmental recovery of the impacted area
Known as Zero Milestone, the program aims to re-establish the original conditions of Ferro-Carvão stream and to recover riparian forest as well as a stretch of Paraopeba river
Nova Lima, January 13, 2020 - Vale launches the pilot project for environmental recovery of an area affected by the breach of dam 1 (B1) at Córrego do Feijão mine, in Brumadinho (Minas Gerais). Known as Zero Milestone, the program aims to re-establish the original conditions of Ferro-Carvão stream, revegetate the riparian forest with native plants, and recover Paraopeba river. The project scope includes installation of the sheet pile wall next to the new bridge at Alberto Flores avenue; it goes 400 meters downstream the Ferro-Carvão stream and two kilometers after the confluence with Paraopeba river. Zero Milestone is a pilot project to be evaluated, adjusted and, once proven effective, can be replicated to other impacted areas on a case-by-case basis. So far, the program has demonstrated efficiency considering the rainfall in the region. The pilot project is expected to be completed by February this year. Investments in the program are part of the funds for emergency containment works in Brumadinho, which should amount R$1.8 billion by 2023. The first challenge of the project was to re-create the layout of the stream prior to the breach. Vale removed 130,000 m³ of tailings from this stretch and, based on topographic surveys and searches to Google Earth history, the original course of the stream was marked. Using the Green Wall technology - a patented system for recovery of watercourses and riparian forests -, Vale re-created the stream channel with rocks at the bottom and walls of biomantle (revegetation). After re-creation of the channel, the surrounding area - the valley of Ferro-Carvão stream - was backfilled and leveled, recovering its original topography.
From topographic surveys and Google Earth searches, the original course of Ferro-Carvão stream was re-created.
Revegetation
The revegetation process of the area defined in the Zero Milestone project will be carried out in three phases. The first phase began after re-creation of the channel of Ferro-Carvão stream. Part of the surface has already been covered by a type of fertile topsoil, and selected groundcover species were hydroseeded (water-aided sowing technique) in the soil. Then, the company applied natural biomantles made of coconut fiber above the sown layer to protect the seeds from the harmful action of birds or rainwater, ensuring an ideal environment for germination and plant formation. In the second phase, medium-sized vegetation will be planted to provide favorable conditions for the third and last phase, which is planting native species of the region. The native species to be used are being defined as well as their origin. Studies are also being done to quantify the number and spacing of seedlings, based on the original composition of the region. Vale states that a forest assessment of the area was carried out to register, catalog and tag each individual (plant) and that, together with the State Institute of Forests (IEF, Instituto Estadual de Florestas), also performed a careful evaluation of the affected species. Species already withered and that would impact safety have been excluded. There are still attempts to recover trees that are at risk of withering away. In such cases, the plants are being cared for and monitored. It is worth noting that the complete revegetation process takes time and is directly affected by external factors, such as climate and the natural cycle of growth and development of plants and the biome itself.
Revegetation process of the Zero Milestone area will be carried out in three phases
Responsible management, safety, health, and environment
For this action, Vale has assigned a multidisciplinary team of about 60 people at the peak of the activities. The company has also been dedicated to deploying a safety, health, and environmental management system throughout the Zero Milestone project. In addition, the company has applied a lean construction model aiming to reduce the impacts during and after construction works, allowing a healthy development of the species used for environmental recovery. Tailings dredging activities on the first two kilometers of Paraopeba river after the confluence with Ferro-Carvão stream complement the actions of the Zero Milestone project. Vale has already removed 59,000 m³ of tailings from the first 400 meters of the stretch. The material removed during dredging is stored and dehydrated in large geotextile bags. The water drained from these bags is pumped into a treatment plant and returns clean to Paraopeba river, in compliance with the standards set out by the National Council for the Environment (Conama, Conselho Nacional de Meio Ambiente). All actions are monitored by an independent technical audit assigned by the Prosecution Office of Minas Gerais and systematically reported to the competent authorities.
Stream channel was re-created with rocks at the bottom and walls of biomantle (revegetation).